Babcock Standpipe Removal
Project includes removal of the 60-year-old 500,000 gallon drinking water standpipe. The standpipe pipe has not been in operation for over 15 years and is beyond repair. Following the removal landscape restoration will be performed.
- Schedule: November 2025 to February 2026
- Contractor: L & M Trucking Inc.