Globe Street Lift Station Rehabilitation
Project includes removal of the existing lift station enclosure, pumps, and control panel. These components will be replaced with new more energy efficient pumps that can better handle the current and future demands.
- Schedule: Unknown (Duration – 1.5 Months)
- Contractor: Crane Engineering Inc.