Glory Road Culvert Replacement (between Commodity and Ridge)

Project includes removal of the existing failed twin 154”X100” Corrugated Metal Culverts and replace with twin 84”X120” Concrete Box Culverts. There will be various other incidental work items that will be performed which includes works on the watermain and stormsewer system near the project.

  • Schedule: Unknown (Duration –  2 Months)
  • Contractor: Advanced Construction Inc.

Project Documents