Packerland Drive (CTH EB) and Grant Street (CTH EE) Roundabout

The proposed improvement would reconstruct the four-way stop-controlled intersection as a single lane roundabout. In addition, the following would be included as part of the proposed constriction: curb and gutter, curb ramps and pedestrian cross walks, concrete sidewalks, and storm sewer replacement.

  • Schedule: Unknown (Duration – 4 Months)
  • Contractor: Unknown

Project Documents