Ridge Standpipe Removal

Project includes removal of the 55-year-old 1,000,000 gallon drinking water standpipe. The standpipe pipe has not been in operation for over 15 years and is beyond repair.  Following the removal landscape restoration will be performed.

  • Schedule: March 2026 to June 2026
  • Contractor: Isler Demolition