Ridge Standpipe Removal
Project includes removal of the 55-year-old 1,000,000 gallon drinking water standpipe. The standpipe pipe has not been in operation for over 15 years and is beyond repair. Following the removal landscape restoration will be performed.
- Schedule: March 2026 to June 2026
- Contractor: Isler Demolition