Cormier Sidewalk Replacement (Shady to Ridge)

Project includes the complete removal and replacement of sidewalk panels on the north side of Cormier Road from Shady Lane to Ridge Road. Proposed sidewalk will be in the same location with the exception of at curb ramps where there will be adjustments to achieve Americans with Disability Act (ADA) slopes. Along with the replacement of the sidewalk on the north side of Cormier spot replacement of sidewalk that will be performed on the south side of the roadway between Hock Street and Ridge. When landscape restoration is performed there will be locations that terraces areas will be regraded to allow for positive drainage of the sidewalk.

  • Schedule: Mid-June to mid-August
  • Contractor: Al Dix Concrete Inc.